Preparations are under way to reopen the Prithvi Highway for two-way traffic from Sunday evening, according to reports. The highway had been closed, and authorities are aiming to restore traffic in both directions, although the reports do not specify the affected section or provide a precise reopening time.
Two-way operation planned
The planned reopening would allow traffic to move in both directions on the highway. Reports say preparations are being made for the change, but provide no further information about what those preparations involve or how traffic will be managed as two-way operation resumes.
The reports also do not identify the reason for the closure. They give no details about when it began, how much of the highway was affected, or whether any restrictions will remain after traffic resumes. As a result, the available information confirms the target for reopening but does not outline the wider circumstances behind the disruption.
Details remain limited
Authorities are aiming to restore two-way traffic by Sunday evening. The reports do not say whether the reopening will happen all at once or whether there will be any conditions for vehicles using the route. They also do not provide an update on traffic conditions or an advisory for travellers.
For now, the main information available is the planned timing and the intention to resume movement in both directions. Further details about the closure, the reopening process and any changes to travel arrangements were not included in the reports.