Mon, 19 Aswin 2083 BS
Patrukar

Sections

Topics

  • Global IME Bank
  • Annual General Meeting
  • Dividend
  • Bonus Shares
  • Nepal Banking
  • Kumari Bank
  • Ramada Encore
  • Kathmandu
  • Banking
  • Discounts
  • Japan
  • Unemployment

Nepal Plans to Revise Road and Bridge Designs After Flood Damage

Nepal's Ministry of Infrastructure Development is preparing to change road and bridge designs to reduce recurring damage from floods and landslides.

The Patrukar
The Patrukar
19 Aswin 2083 BS 1 min read

Nepal’s Ministry of Infrastructure Development is preparing to revise road and bridge designs after recurring damage from floods and landslides. The move is aimed at reducing losses to the country’s road and bridge infrastructure.

Joint Secretary and engineer Bhimarjun Adhikari said floods and landslides cause billions of rupees in damage to road and bridge infrastructure every year.

Ministry seeks to reduce recurring losses

The planned design changes are intended to address the repeated damage caused by natural hazards. The ministry is preparing the revisions, but details of the proposed changes were not provided.

Related Articles