Sat, 17 Aswin 2083 BS
Patrukar

Sections

Topics

  • Global IME Bank
  • Annual General Meeting
  • Dividend
  • Bonus Shares
  • Nepal Banking
  • Kumari Bank
  • Ramada Encore
  • Kathmandu
  • Banking
  • Discounts
  • Japan
  • Unemployment

Muglin–Narayangadh Road Reopens After Rockfall at Namsi Bridge

Traffic on the Muglin–Narayangadh road was restored after machinery cleared falling rocks and landslide debris near Namsi bridge, but the Road Division Office Bharatpur warned that the risk remains.

The Patrukar
The Patrukar
17 Aswin 2083 BS 1 min read
Muglin–Narayangadh Road Reopens After Rockfall at Namsi Bridge

Traffic on the Muglin–Narayangadh road has resumed after falling rocks near Namsi bridge left the route operating in one direction. The Road Division Office Bharatpur said machinery and equipment were used to clear the debris.

Rocks began falling from above the bridge at 9:15 pm on Friday and continued afterward, prompting the office to advise people travelling on the section at night to take precautions.

Road reopened, landslide risk remains

Although the road has reopened, the Road Division Office said the risk of landslides remains along the section. It urged travellers to follow lane discipline and drive cautiously.

Sources

Clustered via K cha khabar.

Related Articles