Sat, 17 Aswin 2083 BS
Patrukar

Sections

Topics

  • Global IME Bank
  • Annual General Meeting
  • Dividend
  • Bonus Shares
  • Nepal Banking
  • Kumari Bank
  • Ramada Encore
  • Kathmandu
  • Banking
  • Discounts
  • Japan
  • Unemployment

Landslides Hit Kaligandaki Corridor at 46 Locations, Disrupting Transport

Continuous rainfall since Ashoj 8 has triggered landslides and other damage at 46 locations along the Kaligandaki Corridor, disrupting transport and affecting the Korala route to the Nepal-China border.

The Patrukar
The Patrukar
17 Aswin 2083 BS 1 min read
Landslides Hit Kaligandaki Corridor at 46 Locations, Disrupting Transport

Continuous rainfall since Ashoj 8 has triggered landslides at 46 locations along the Kaligandaki Corridor, disrupting transport services on the Maladhunga–Beni–Jomsom–Korala road.

The corridor project said road sections from Latikhola, Farsya, Jukekhola, Beni, Dana, Ghasa and Marpha to Korala have been affected. Landslides, falling rocks, flooding in rivers and streams, and road erosion have damaged sections of the route.

Landslides affect route to Korala

The disruption extends to the Nepal-China border route via Korala. The affected road forms part of the corridor connecting Maladhunga, Beni, Jomsom and Korala.

Transport services along the corridor have been disrupted by the rainfall-related damage, including landslides and flooding.

Sources

Clustered via K cha khabar.

Related Articles