Thu, 29 Aswin 2083 BS
Patrukar

Sections

Topics

  • Global IME Bank
  • Annual General Meeting
  • Dividend
  • Bonus Shares
  • Nepal Banking
  • Kumari Bank
  • Ramada Encore
  • Kathmandu
  • Banking
  • Discounts
  • Japan
  • Unemployment

Ferry Service Resumes at Satighat on Arun River After Five-Month Suspension

Ferry service has resumed at Satighat on the Arun River, restoring a crossing between Bhojpur and Sankhuwasabha districts ahead of Dashain and Tihar.

The Patrukar
The Patrukar
29 Aswin 2083 BS 3 mins read
Ferry Service Resumes at Satighat on Arun River After Five-Month Suspension

Ferry service has resumed at Satighat on the Arun River, restoring a river crossing between Bhojpur and Sankhuwasabha districts after a five-month suspension that began in Jestha because of monsoon rains. The service has been brought back into operation ahead of Dashain and Tihar, with the aim of making travel between the two districts easier. In the absence of a permanent bridge, the ferry is an important option for crossing the river at Satighat.

Service returns after monsoon suspension

The ferry had remained out of operation since Jestha, when monsoon rains led to its suspension. Its return ends a prolonged interruption for people who need to cross the Arun River at Satighat. The service’s resumption is particularly timely because it comes before the Dashain and Tihar festivals, a period for which easing travel was a stated reason for bringing the ferry back.

The five-month gap also highlights how seasonal conditions affect river crossings where there is no permanent bridge. At Satighat, the ferry provides a way to travel between Bhojpur and Sankhuwasabha, but the service was unavailable during the monsoon period. With the ferry operating again, the crossing has been restored for people travelling between the districts.

A river crossing without a permanent bridge

The lack of a permanent bridge has made crossing the Arun River difficult. The ferry’s return therefore addresses an immediate transport need at Satighat, while the underlying limitation remains: there is no permanent structure at the crossing. The service offers a means of getting across the river, but its operation has been affected by seasonal monsoon conditions.

The suspension and restart show the importance of the ferry to this particular connection. When it was stopped, people could not use the Satighat ferry to cross between the two districts. Its resumption restores that option, though the available information does not specify any change to the crossing infrastructure or indicate that a bridge is being built.

Festive travel in focus

The ferry has been brought back into operation with the aim of easing travel during Dashain and Tihar. Its return provides a crossing option at a time when people may need to travel between Bhojpur and Sankhuwasabha for the festivals. The service links the two districts across the Arun River, where the absence of a permanent bridge has made travel difficult.

The resumption is a practical step toward improving access at Satighat for the coming festive period. It ends the five-month interruption that began in Jestha and restores the ferry as a means of crossing the river. However, the service’s return does not change the longer-standing fact that the crossing lacks a permanent bridge. For now, the ferry is operating again to support travel between the districts and help ease movement during Dashain and Tihar.

Sources

Clustered via K cha khabar.

Related Articles