Wed, 21 Aswin 2083 BS
Patrukar

Sections

Topics

  • Global IME Bank
  • Annual General Meeting
  • Dividend
  • Bonus Shares
  • Nepal Banking
  • Kumari Bank
  • Ramada Encore
  • Kathmandu
  • Banking
  • Discounts
  • Japan
  • Unemployment

Chitwan Weighbridge Shut for Three Months, Raising Road Safety Concerns

The Aaptari weighbridge in Bharatpur, the only station monitoring overloaded vehicles on the Narayangadh-Muglin road, has been out of operation for three months.

The Patrukar
The Patrukar
21 Aswin 2083 BS 1 min read
Chitwan Weighbridge Shut for Three Months, Raising Road Safety Concerns

The only weighbridge monitoring overloaded vehicles on the Narayangadh-Muglin road has been out of service for three months, raising concerns about road safety on a key route linking Chitwan and Kathmandu.

The weigh station at Aaptari in Bharatpur Metropolitan City-1 stopped operating after its beam broke on Asar 12. With vehicle weighing halted, the ability to control overloaded traffic on the road section has weakened.

Weighing halted after beam broke

The Aaptari facility is the only weigh station monitoring overloaded vehicles on the Narayangadh-Muglin road section, described as a main lifeline connecting Chitwan and Kathmandu.

Its shutdown has left authorities without the station's usual weighing checks, while overloaded vehicles remain a road safety concern.

Road safety concerns

The weighbridge's three-month closure has weakened control over overloaded vehicles on the busy route. The available information does not specify when the facility will resume operations.

Sources

Clustered via K cha khabar.

Related Articles