Mon, 19 Aswin 2083 BS
Patrukar

Sections

Topics

  • Global IME Bank
  • Annual General Meeting
  • Dividend
  • Bonus Shares
  • Nepal Banking
  • Kumari Bank
  • Ramada Encore
  • Kathmandu
  • Banking
  • Discounts
  • Japan
  • Unemployment

Bijauri–Kotheri Road Upgrade Underway in Dang at Rs 448.7 Million

The 15.58-kilometre Bijauri–Kotheri road in Dang is being blacktopped, with drainage construction and culvert installation in their final phase.

The Patrukar
The Patrukar
19 Aswin 2083 BS 1 min read
Bijauri–Kotheri Road Upgrade Underway in Dang at Rs 448.7 Million

Upgrading work on the 15.58-kilometre Bijauri–Kotheri road in Dang is underway, with drainage construction and culvert installation nearing completion. The road is being blacktopped at a cost of Rs 448.7 million.

The project is being carried out under the Lumbini Province government’s Rural Connectivity Improvement Project. It follows the route from Bijauri through Basdabara, Jamuni, Laxmipur, Dakshin Kurariya and Kanjawar to Kotheri.

Bijauri–Kotheri road project

  • Road length: 15.58 kilometres
  • Project cost: Rs 448.7 million
  • Work: Blacktopping, drainage construction and culvert installation
  • Project: Rural Connectivity Improvement Project of the Lumbini Province government

Sources

Clustered via K cha khabar.

Related Articles