A Water Resources Management Project Office has been established in Beni, the headquarters of Myagdi district, under the federal Ministry of Energy, Water Resources and Irrigation, with the aim of managing water resources across the Kali Gandaki river basin. The newly formed office will oversee and implement river control, settlement protection and irrigation projects in the districts falling within the Kali Gandaki river basin, an area that has long faced challenges ranging from flooding and riverbank erosion to the need for reliable irrigation infrastructure.

The office has been located at Shikshamarg in Beni. Its establishment brings a federal-level water resource management presence directly to the Gandaki region, where the Kali Gandaki river and its tributaries shape the lives and livelihoods of communities across multiple districts.

Mandate of the New Office

According to information published by Rastriya Samachar Samiti and reported by Ratopati and Gorkhapatra, the Water Resources Management Project Office has been constituted under the federal Ministry of Energy, Water Resources and Irrigation. The office's core responsibilities include:

  • Carrying out river control projects to manage the flow and behaviour of rivers within the Kali Gandaki river basin
  • Implementing settlement protection programmes to safeguard communities living near rivers from flooding and erosion
  • Developing and managing irrigation projects to support agriculture in the basin's districts

By situating the office in Beni, which lies along the Kali Gandaki river itself, the ministry has placed project management physically close to the river system it is meant to manage. This proximity is expected to allow officials to monitor river conditions and coordinate field-level activities more effectively than a distant federal office could.

Significance for the Kali Gandaki Basin

The Kali Gandaki is one of Nepal's major river systems, flowing through districts that include Myagdi and passing through diverse terrain from high Himalayan valleys down through mid-hill areas. Communities along the river and its tributaries have repeatedly dealt with issues such as riverbank cutting, threats to settlements and farmland, and seasonal floods, making river control and settlement protection a persistent local demand.

At the same time, agriculture in the basin depends heavily on irrigation, and the absence of well-managed irrigation infrastructure has long constrained farming productivity in many parts of the districts within the basin. The establishment of a dedicated project office signals the federal government's intent to address these water-related challenges in a coordinated, basin-wide manner rather than through scattered, ad hoc interventions.

Federal Presence in Myagdi

The creation of the office in Beni also reflects the broader structure of Nepal's federal governance system, under which ministries based in Kathmandu establish project offices and subordinate units in the provinces and districts to deliver programmes on the ground. As a federal body under the Ministry of Energy, Water Resources and Irrigation, the new office will function as the ministry's implementing arm for water resources management activities in the Kali Gandaki river basin.

For Myagdi, hosting the office at Shikshamarg in Beni means the district becomes the administrative centre for water resources management work covering the wider basin. Local stakeholders, including communities affected by river-related hazards and farmers awaiting irrigation facilities, now have a designated federal office in the district headquarters to which projects, coordination and follow-up on water resource matters can be directed.

What Lies Ahead

With the office now established, attention is expected to turn to the operationalisation of its mandate: staffing the office, identifying and prioritising river control, settlement protection and irrigation projects across the basin's districts, and mobilising resources for their implementation. The office's work is anticipated to play a role in reducing the vulnerability of riverside settlements and strengthening agricultural water supply in the Kali Gandaki river basin.

The establishment of the Water Resources Management Project Office in Beni marks a concrete federal step toward structured water resource management in one of Nepal's most significant river basins, bringing the Ministry of Energy, Water Resources and Irrigation's project machinery directly into the heart of the Gandaki region.