An Infrastructure Development Division Office has been established in Nuwakot district to implement infrastructure development plans in the region, including the reconstruction of physical structures damaged by the Bhote Koshi flood.
The new office, which has begun operations in Bidur, will provide its services to three districts: Nuwakot, Rasuwa and Dhading. This was confirmed by Sachindra Kumar Yadav, the Division Chief and Senior Divisional Engineer, who stated that the office will function as a key body for infrastructure works across the three hill districts.
Mandate of the New Office
According to Division Chief Yadav, the primary focus of the division office will be on rebuilding the road networks that were damaged in the Bhote Koshi flood. The disaster destroyed critical transport links, and restoring connectivity is a top priority for the affected areas.
In addition to roads, the office will oversee the reconstruction of bridges damaged by the flood. This includes both concrete bridges and suspension bridges, which serve as vital crossing points for communities in the hilly terrain of Nuwakot, Rasuwa and Dhading.
Coverage Across Three Districts
Operating out of Bidur, the headquarters of Nuwakot district, the division office is expected to coordinate development and reconstruction work across a wide geographic area. Nuwakot, Rasuwa and Dhading are neighbouring districts in the Bagmati region, and a single division office serving all three is intended to streamline the implementation of infrastructure plans.
The establishment of the office follows the Bhote Koshi flood, which inflicted significant damage on physical infrastructure in the region. With the new office in place, the reconstruction of damaged roads and bridges can be planned and executed under dedicated engineering supervision.
Moving Reconstruction Forward
The creation of the Infrastructure Development Division Office marks a formal step toward restoring and developing infrastructure in the flood-affected districts. As the office scales up its operations in Bidur, residents of Nuwakot, Rasuwa and Dhading can expect reconstruction projects to move ahead under a dedicated division led by Senior Divisional Engineer Sachindra Kumar Yadav.
Details on specific project timelines and budgets have not yet been announced, but the office's stated priorities remain clear: rebuilding flood-damaged road networks and restoring both concrete and suspension bridges across the three districts it serves.