Kathmandu Metropolitan City has begun construction of a sky bridge with lifts that will connect the old and new buildings of Bir Hospital, two structures currently separated by the main road leading to Mahaboudha. Acting Mayor Sunita Dangol laid the foundation stone for the project, which is estimated to cost Rs 47.13 million and is targeted for completion by November 15 next year.
The new infrastructure is expected to make it far easier for patients, their attendants, and hospital staff to move between the two buildings without having to cross the busy road at ground level, where pedestrian movement has long been risky due to heavy traffic.
A Long-Standing Need at the Capital's Oldest Hospital
Bir Hospital, one of the oldest and most heavily used hospitals in Kathmandu, operates from buildings on either side of the main road leading to Mahaboudha. This split has long posed practical challenges for the hospital's daily functioning, as patients often need to move between departments housed in the two structures, including those requiring urgent care or being transported on stretchers.
Crossing the road at street level has been particularly difficult for seriously ill patients, elderly visitors, and people with disabilities, given the constant flow of vehicles along this central corridor of the capital. The sky bridge with lifts is designed to address exactly this problem, allowing safe and convenient vertical and horizontal movement between the buildings without exposure to traffic.
Foundation Stone Laid by Acting Mayor
The project formally got underway when Acting Mayor Sunita Dangol laid the foundation stone for the sky bridge. Her presence at the ceremony underlined the metropolitan city's commitment to improving civic and health-related infrastructure within its jurisdiction, with Bir Hospital being one of the most important public health institutions in the Kathmandu Valley.
The estimated cost of the project stands at Rs 47.13 million, a figure that covers the construction of the bridge itself along with the lifts that will make the structure accessible to all users. With a completion deadline of November 15 next year, the project now moves into its construction phase, during which residents and commuters in the area can expect to see work progressing above the road linking the hospital's two buildings.
What the Project Involves
The planned structure will be a sky bridge, an elevated walkway spanning the main road to Mahaboudha, equipped with lifts to provide access at both ends. This combination is significant for a hospital setting, as lifts ensure that patients on wheelchairs, stretchers, or with limited mobility can use the bridge without difficulty.
- The bridge will directly connect the old and new buildings of Bir Hospital.
- Lifts will be installed to make the crossing accessible for patients and persons with disabilities.
- The estimated project cost is Rs 47.13 million.
- Completion is targeted by November 15 next year.
Expected Benefits for Patients and the Public
Once completed, the sky bridge is expected to deliver a range of benefits. For patients, it will remove the need to cross a busy road between appointments, treatments, or hospital wards located in different buildings. For the hospital, it should improve the efficiency of patient flow and reduce delays in moving people between facilities.
The wider public is also likely to benefit. An elevated crossing over the road to Mahaboudha could reduce the number of pedestrians attempting to cross at ground level in a congested area, potentially easing one of the hazard points in central Kathmandu's road network. Given that the bridge will be built specifically to link the hospital buildings, however, its primary users will be the thousands of patients and visitors who depend on Bir Hospital's services every day.
Part of Broader Urban Infrastructure Efforts
The initiative reflects Kathmandu Metropolitan City's ongoing interest in urban infrastructure projects within the core areas of the capital. With the foundation stone now laid and funding in place at an estimated Rs 47.13 million, attention will turn to timely execution, and whether the November 15 deadline can be met will be closely watched given the hospital's critical role and the busy location of the construction site.
For now, the project marks a concrete step toward addressing a long-felt need at Bir Hospital, promising safer and easier movement between its two main buildings for the patients and staff who rely on them.