Kathmandu Metropolitan City is set to construct a lift-equipped skybridge connecting the new and old buildings of Bir Hospital in Kathmandu, a project aimed at easing the movement of patients and visitors between the two main structures of the capital's oldest hospital. Acting Mayor of Kathmandu Metropolitan City Sunita Dangol laid the foundation stone for the project, formally marking the start of construction work.
The skybridge will be built at a cost of Rs 47.134 million, and the metropolitan city has set a deadline of Kartik 30 next year for its completion. The inclusion of a lift in the bridge is expected to make the connection between the two buildings more accessible, particularly for patients, elderly citizens, and people with disabilities who regularly move between the buildings for treatment and services.
A Project to Ease Patient Movement
Bir Hospital, one of the country's key government-run health institutions, serves a large number of patients daily from Kathmandu and across the country. With the hospital's services spread across its new and old buildings, patients and their relatives have long had to move between the two structures, often facing difficulties in doing so.
The construction of the skybridge is expected to address this long-standing inconvenience. Once completed, the lift-equipped bridge will allow patients, staff, and visitors to move directly between the two buildings without having to descend to ground level, an improvement that is especially significant for those receiving emergency care or undergoing treatment in different departments.
Foundation Stone Laid
The project officially began after Acting Mayor Sunita Dangol laid the foundation stone for the skybridge. Her presence at the ceremony underlined the metropolitan city's direct role in the project, with the municipal body taking responsibility for the infrastructure that will connect the two hospital buildings.
The decision to include an elevator in the design reflects an emphasis on accessibility, ensuring that the bridge will serve all categories of patients and visitors rather than only those who can use stairs or walk long distances.
Cost and Timeline
The metropolitan city has allocated Rs 47.134 million for the construction of the skybridge. With the foundation stone now laid, construction work is expected to proceed with a target of completing the project by Kartik 30 next year.
The timeline gives the construction team roughly a year to finish the work, a period in which the bridge, along with its lift facilities, is to be readied for public use. Meeting this deadline will be important for the hospital, which continues to see heavy footfall in both of its buildings.
Significance for the Capital's Health Infrastructure
The skybridge project comes as part of ongoing efforts to improve facilities at government hospitals in Kathmandu. As the capital's flagship hospital, Bir Hospital handles a significant share of the country's patient load, and improvements to its physical infrastructure are expected to have a direct impact on the experience of the thousands of people who visit it every day.
By investing in a lift-equipped skybridge, Kathmandu Metropolitan City has signalled its intention to support health institutions within its jurisdiction with practical infrastructure. Once completed by the Kartik 30 deadline, the bridge is expected to make movement between the hospital's new and old buildings faster, safer, and more comfortable for patients and visitors alike.
The project is being followed by multiple media outlets, with details of the cost, timeline, and foundation stone ceremony reported by Ratopati, Nepal Press, and Nepal Lead.